Are you dreaming of a stunning new bathroom but feeling unsure about the time it will take? It’s a question many homeowners ask when they’re ready to start a renovation.
After all, the bathroom is one of the most used spaces in the home, and no one wants to be without it for too long!
The good news? A well-planned bathroom renovation doesn’t have to take forever. Whether you’re giving your bathroom a modern upgrade or a complete makeover, knowing the timeline helps you prepare.
Here’s everything you need to know about how long to renovate a bathroom and what happens during each stage.
How Long To Renovate A Bathroom?
The timeline for a bathroom renovation can vary, but generally, it takes 2 to 4 weeks for a standard project. Of course, the size of the bathroom and the type of renovation—whether it’s a full remodel or just cosmetic updates—play a huge role.
1. Planning and Design (1–2 Weeks)
Before the tools come out, the design needs to be finalised. This includes:
- Deciding the layout
- Choosing tiles, fixtures, and fittings
- Preparing your budget and timeline
Quick tip: Sorting out all your choices early will avoid delays down the road.
2. Demolition and Preparation (2–3 Days)
Once the planning is sorted, it’s time to strip away the old. This stage is all about removing old tiles, fixtures, and sometimes plumbing or wiring. For smaller bathrooms, this can be quicker, but larger spaces may take a bit more time.
3. Plumbing and Electrical Work (3–5 Days)
Here’s where the experts step in. If you’re moving fixtures like the toilet, shower, or sink, the plumbing might take longer. Similarly, installing new lighting or exhaust fans requires electrical work. These steps need to be done right to avoid future issues.
4. Tiling and Flooring (4–7 Days)
Laying tiles is a detailed process. From waterproofing to perfect grout lines, this stage is all about precision. The size of your bathroom and the type of tiles you choose will impact the timeline.
5. Fittings and Fixtures (2–3 Days)
Once the tiles are set, your bathroom starts to take shape. Installing the vanity, shower screens, mirrors, and other accessories happens quickly at this point.
6. Final Touches and Cleanup (1–2 Days)
The last step is all about the finishing touches—painting, sealing, and ensuring everything works perfectly. After a quick clean-up, your new bathroom is ready to use!
Factors That Affect How Long It Takes
- Size of the Bathroom: Smaller bathrooms usually take less time.
- Design Complexity: Fancy features or custom items might need more time.
- Unexpected Issues: Hidden problems, like water damage or outdated plumbing, can add extra days.
So, how long does it take to renovate a bathroom? For most projects, you’re looking at 2 to 4 weeks. With good planning and a reliable team, the process can be smooth and even enjoyable.
If you’re ready to give your bathroom a fresh new look, Renocircle is here to help. We specialise in bathroom renovations in the Hills District and surrounding areas. Let us handle everything while you sit back and enjoy the transformation!
FAQs
Yes, but it may be inconvenient, especially if it’s your only bathroom. Proper planning, like setting up temporary facilities, can make it manageable.
In most cases, cosmetic updates don’t require approval. However, structural changes or major plumbing work might need permits, so it’s best to check with local authorities.
Reusing existing fixtures, opting for standard designs, and sourcing materials during sales can help lower costs. Discuss budget-friendly options with your renovation team.